What materials does a solar installation need?

A complete installation needs more than panels and a battery. This checklist explains the main equipment and supporting materials, so you can understand your proposal and prepare your property. The final quantities depend on the system design and site visit.

Installation materials at a glance
Materials and equipmentSolar + batteryBattery only
Panels and roof mountingPanels, rails, clamps and roof attachments.RequiredNot needed
Solar wiringSolar cables, compatible connectors and array protection; combiner boxes where needed.RequiredNot needed
Inverter and batteriesCompatible equipment, battery supports, cables and communication connections.RequiredRequired
Electrical protectionBreakers, fuses, disconnects, surge protection and grounding, as designed.RequiredRequired
House connectionsAC wiring, conduit, boxes and connections to selected backup circuits.RequiredRequired
Property-specific workTrenching, roof repairs, electrical upgrades or a new equipment area.If specifiedIf specified
Optional additionsMonitoring accessories or a generator connection, if included in the design.If specifiedIf specified
Required means part of the system design, not automatically included in every quote. Confirm quantities, specifications and any extra work in your proposal.

Start with the type of system

Solar with battery backup needs panels, mounting, an inverter, batteries and the wiring and protection that connect them to your home. Battery-only backup leaves out the panels and their roof equipment, but still needs an inverter, storage, electrical protection and connections to the selected circuits.

1. Panels and mounting

For a solar system, expect solar panels, mounting rails, panel clamps and roof attachments, or a suitable ground-mounted structure. Roof penetrations need appropriate sealing. The mounting approach depends on the roof material, condition and layout.

Solar cable and compatible panel connectors link the array to the inverter. Combiner boxes may be needed depending on the arrangement of the panels. For coastal properties, the suitability of exposed mounting and enclosure materials also matters.

2. Inverter and battery equipment

The inverter manages power conversion; the battery stores energy for later use. The equipment must be compatible with the home’s electrical supply, the intended loads and each other. Include battery cables, terminals, any required busbars and the specified communication cables in the materials list.

Batteries may need a rack, cabinet or wall mounting. Plan a suitable equipment location with access for maintenance and the clearances and ventilation required by the manufacturer. Monitoring equipment and a network connection should be specified if included.

3. Protection, grounding and house connections

The electrical design determines the DC and AC disconnects, breakers, fuses and surge protection. Grounding and bonding conductors, connections and any required earth electrodes are also part of the installation. These items protect the system and allow equipment to be isolated for service.

On the house side, expect AC cable, distribution boards or breaker-panel changes, and connections for the circuits selected for backup. Conduit, cable trunking, junction boxes, enclosures, cable glands, fixings and labels complete the cable routes.

Cable sizes and protection ratings are selected for the actual equipment, loads and cable routes. A general checklist cannot replace the electrical design or serve as a shopping list with universal sizes.

4. Extras that depend on the property

Long cable runs, underground conduit, trenching, roof repairs or a new equipment area can add materials and work. A generator connection may require transfer equipment and controls if it is part of the agreed design. Future expansion should be discussed before equipment is ordered.

Your installation, clearly planned

Before ordering equipment, we assess your property and explain the proposed system: panels, inverter, batteries, mounting, wiring and protection, including which circuits will have backup.

Labour is part of the installation budget, alongside equipment and materials. It covers the agreed installation work, configuration, testing and commissioning. Roof access, cable routes, trenching and electrical upgrades can change the scope.

Your Suntiago proposal sets out the equipment, installation work and any property-specific extras, such as trenching or electrical upgrades. You’ll know what’s included and what needs to be prepared before installation.